- Terms Of Service Production Policy
- Terms Of Service
- Standard Sign Production Time
- Production Priority Levels
- Why Quarter Cheaper Signs Is Faster Than Other Sign Shops
- Installation, Warranty & Material Policy
- Print Color & Reprint Policy
- Why We Prefer Email Communication Instead of SMS or Messaging Apps
- Storage, Handling and Material Limitations Policy
- Print Imperfections & Color Expectations Policy
- Installation & Surface Liability Policy
- Artwork & Design Approval Policy
- Deposits, Design Time & Project Initiation Policy
- How Orders Work (Please Read Before Ordering)
- Outdoor Installation & Bucket Truck Work
- Site Access Requirements
Quarter Cheaper Signs
At Quarter Cheaper Signs, our production workflow is designed to deliver professional signage quickly while keeping pricing affordable for businesses of all sizes.
To maintain efficiency, all projects — regardless of size — require similar preparation and production steps.
1. Every Order Requires Production Setup
Even small orders involve:
- file preparation
- machine setup
- material handling
- printing calibration
- cutting and finishing
- quality control
Because production setup time remains similar, very small orders cannot always be completed immediately.
2. Minimum Production Scheduling
Orders with a total value below $50 are scheduled between larger commercial production jobs.
Typical turnaround time for small orders:
✅ 3–4 business days
This scheduling system allows us to maintain competitive pricing for all customers.
3. Why Small Orders May Cost More Per Item
Production equipment is optimized for batch manufacturing.
As a result:
- larger quantities reduce cost per unit
- smaller quantities require the same setup time
- rush scheduling impacts ongoing production
This is standard practice across the printing and signage industry.
4. Faster Options Available
Customers who require faster completion may request:
✅ Priority Production
✅ Rush Production
Availability depends on daily production workload.
5. Combining Orders
Whenever possible, customers are encouraged to combine items into a single order.
This often results in:
✔ lower unit pricing
✔ faster scheduling
✔ improved production efficiency
6. Our Commitment
Our goal is to balance:
- fast turnaround
- fair pricing
- consistent production quality
Efficient scheduling allows Quarter Cheaper Signs to remain both fast and Quarter Cheaper.
7. Acceptance of Policy
By placing an order, customers acknowledge understanding of minimum production scheduling and order efficiency requirements.
✅ Quarter Cheaper Signs
Efficient Production • Fair Pricing • Fast Turnaround
🔹 Minimum Order & Small Job Policy
To maintain fast turnaround times and consistent quality, all orders are subject to a minimum charge of $100.
Smaller jobs are still welcome, but may include a small job handling fee due to setup time, material preparation, and machine calibration.
We recommend combining multiple items into one order to get the best value.
🔹 Design Policy
Free design service is available for orders over $200.
For smaller projects, design work is billed separately.
🔹 Production Priority
Smaller orders are typically scheduled within standard production timelines (2–4 business days).
- Terms Of Service Production Policy
- Terms Of Service
- Standard Sign Production Time
- Production Priority Levels
- Why Quarter Cheaper Signs Is Faster Than Other Sign Shops
- Installation, Warranty & Material Policy
- Print Color & Reprint Policy
- Why We Prefer Email Communication Instead of SMS or Messaging Apps
- Storage, Handling and Material Limitations Policy
- Print Imperfections & Color Expectations Policy
- Installation & Surface Liability Policy
- Artwork & Design Approval Policy
- Deposits, Design Time & Project Initiation Policy
- How Orders Work (Please Read Before Ordering)
- Outdoor Installation & Bucket Truck Work
- Site Access Requirements

